Through floor lift installation: the opening, approvals and paperwork

Through floor lift installation means making an opening in a floor for the car to travel through, fitting the lift, and making good on both floors. Affordable Mobility’s page says the Pollock lift travels vertically through a specially prepared opening and that its self-supporting design can reduce the structural alterations needed (Affordable Mobility, checked 13 November 2026). Before any of it, check whether the work needs building regulations approval (GOV.UK, checked 13 November 2026), and if a grant is involved, wait for the council’s approval (GOV.UK, checked 12 November 2026).

Last reviewed against its sources: 13 November 2026. Each figure links to the page it was read on.

What fitting involves

This page describes the stages so you know what to ask about; the work itself is for the installer. A survey comes first, to choose where the lift goes and what is above and below that spot. Then the opening is made in the floor, the lift is fitted and connected, and the rooms on both floors are made good. Affordable Mobility’s page describes the Pollock lift as joining two floors, with up to 4.2 metres of travel, through an opening prepared for it (Affordable Mobility, checked 13 November 2026).

A maker that prints no price explains that the amount of preparation work the property needs is one of the things that sets the cost (Vimec, checked 13 November 2026), which is why the survey matters. Ask for the opening’s size and position in writing, and for a written schedule of the work.

How long fitting takes, as makers print it

Makers’ own pages, read on 13 November 2026, give their own times, and most separate the builders’ preparation from fitting the lift:

  • Stiltz: “Typical installation takes one day”; separately, its builders carry out any necessary work on the home, which it says usually takes around two to three days (Stiltz, checked 13 November 2026). It adds that its lifts do not need to be fixed to a wall to operate (Stiltz, checked 13 November 2026).
  • Terry Lifts: for the Harmony FE, any necessary preparatory work follows the survey, “and then the lift fitted in less than two days”; it says the lift does not require a shaft (Terry Lifts, checked 13 November 2026).
  • Pollock Homelifts: “Typically installing your home lifts takes 1 – 2 days” (Pollock Homelifts, checked 13 November 2026).
  • Stannah Lifts: its residential lifts are “installed and ready for use within a few days after the builders work” (Stannah Lifts, checked 13 November 2026).
  • TKE Home Solutions: its through-floor lift page says installation “takes no more than a day” (TKE Home Solutions, checked 13 November 2026).

These are each maker’s own words for its own lifts, not a promise for your home; the builders’ work before fitting depends on the house.

Who decides what

The questions before fitting, and who answers each
Question Who answers it Source
Does the work need building regulations approval? A building control body, the council’s team or a registered approver (GOV.UK, checked 13 November 2026)
Is planning permission needed as well? The council’s planning team; it is a separate question (GOV.UK, checked 13 November 2026)
Will a grant pay, and when can work start? The council, after approval; permissions are applied for separately (GOV.UK, checked 13 November 2026)
May a tenant have a lift fitted? The landlord, who cannot unreasonably withhold consent (government guidance to councils, checked 13 November 2026)
Is the making good zero-rated? The supplier, under HMRC’s notice, for a qualifying installation (HMRC Notice 701/7, checked 13 November 2026)

Building regulations

GOV.UK’s page on when you need building regulations approval lists alteration projects that might need it, from fuse boxes and bathrooms to heating systems and windows. Lifts are not on the list, but the page says you could need approval for work that is not listed, and that you should check with a building control body if you cannot decide (GOV.UK, checked 13 November 2026). It also says you do not need to get approval yourself if you use someone registered with a competent person scheme (GOV.UK, checked 13 November 2026).

So ask the installer, before you sign, who will deal with building control, whether it uses a competent person scheme for any part of the job, and who will hold the completion certificate. Keep that certificate with the house papers.

Planning permission

GOV.UK says building regulations approval is different from planning permission, and that you might need both (GOV.UK, checked 13 November 2026). If a grant is paying, GOV.UK says you apply separately for any planning permission or building regulations approval (GOV.UK, checked 13 November 2026). Your council’s planning team can say whether permission applies to your home.

The grant’s paperwork and fees

Help with through-floor lifts normally comes through the Disabled Facilities Grant (government guidance to councils, checked 13 November 2026). The 1996 Act allows certain services and charges to be included with a grant application, among them technical and structural surveys, plans and drawings, and applications for building regulations approval and planning permission (government guidance to councils, checked 13 November 2026). Ask the council which fees it will include before they are paid.

Most important of all: if you hope for a grant, nothing should be ordered or started until the council has approved it, because work started first may get no grant (GOV.UK, checked 12 November 2026). A survey and a quote are not starting.

VAT on the work around the lift

Installing a lift to help a disabled person move between floors of their home carries no VAT (GOV.UK, checked 13 November 2026), and HMRC lets the supplier zero-rate the preparation and necessary restoration work that a qualifying installation needs, the opening and the making good among it (HMRC Notice 701/7, checked 13 November 2026). A separately engaged architect’s or surveyor’s fee is standard-rated unless the job is a single design-and-build arrangement (HMRC Notice 701/7, checked 13 November 2026). More on VAT relief on lifts.

Rented homes and flats

A tenant needs the landlord’s consent for an adaptation of this kind. Under the Equality Act 2010 a landlord cannot unreasonably withhold consent or attach unreasonable conditions (government guidance to councils, checked 13 November 2026). In a flat, the freeholder or managing agent may need to agree too; ask before the survey.

After the installer leaves

Before signing for the job, ask the installer to state the cancellation position in writing: the right to cancel does not cover goods made to the buyer’s specifications, and where there is none, the trader must say so before you are bound (legislation.gov.uk, checked 12 November 2026). Once the lift is in, tell your home insurer; one council’s guide advises this so the lift is covered against fire or accidental damage (Derbyshire County Council, checked 13 November 2026). Servicing starts from day one, and the footprint the lift needs is on sizes and space. What the whole job is likely to include on a quote is on through-floor lift cost.

Questions about fitting a lift

Sources for the figures on this page

Every price, limit and rule above comes from one of these pages. If one of them has changed since we read it, tell us and we will go back to it.

How sources are chosen and checked

Get a home lift quote

Say which floors the lift should join and give the postcode. Your details come to SEO Dons Ltd, which publishes Home Lift Grants, and we reply by email. Asking binds you to nothing.

What happens next

  1. Your request goes to SEO Dons Ltd, the publisher of this site.
  2. We read what kind of lift you are asking about and answer by email.
  3. Nothing is agreed until you sign a quote. With a council grant in view, the council approves the work before anything is ordered.
Add a little about the home (optional)

Published by SEO Dons Ltd. We don't make, sell or fit lifts ourselves. We reply by email. See the privacy notice.

Get a home lift quote